December 14, 2007, Underwood Plaza Update
Exterior framing continued to be installed at the 7th Floor.
Interior partitions were being framed at the 8th Floor.
The parapet walls at the porches at the north elevation were being framed up and sheathed.
Wood windows continued to be installed at the west elevation.
Roof beams continued to be hung.
Copper and cast iron piping continued to be run at the upper floors.
Masonry installation began at the west elevation.















Interior partitions were being framed at the 8th Floor.
The parapet walls at the porches at the north elevation were being framed up and sheathed.
Wood windows continued to be installed at the west elevation.
Roof beams continued to be hung.
Copper and cast iron piping continued to be run at the upper floors.
Masonry installation began at the west elevation.